Ton Dong A Steel Factory

Ton Dong A Steel Factory

Supply and installation of 22KV Switchgear System, substation with the total power of 33,500 KVA (3×3000 KVA + 2X4000 KVA + 4×3500 KVA + 1×2500 KVA), main MSB. Switchgear Distribution Main Power, busway, control cable and production line system for Ton Dong A Steel at Dong An 2 Industrial Park, Binh Duong Province.

PROJECT INFORMATION

Client / Investor
Ton Dong A Corporation
Location
Dong An 2 IP, Binh Duong
Scale / Grade
Total power 33,500 KVA
M&E Scope
Factories & Industrial Parks

Partnership & Quotes

Get in touch with us to receive the most optimal engineering design and budget plan.

Hotline: +84 908 020 777 Send inquiry form
+84 908 020 777 Zalo Messenger LinkedIn